01
Aluminum Sand Casting Foundry Aluminium Motor Casting Frame
Quality Control
Test facility: spectrometer, tensile test machine, impact tester, hardness test machine, CMM, PT.
In order to ensure the quality of the orders, our independent QC members to carry out strict inspection at each stage:
(1)Incoming material inspection
(2)Inspection of work-in-progress
(3)Finished product inspection
(4)Random warehouse inspections
Detail Picture
FAQS
1. How can I get the quotation?
Please send us information for quote: drawing, material, weight, quantity and request.
2. If we don't have drawing, can you make drawing for me?
Yes, we make the drawing of your sample and duplicate the sample.
3. When can I get the sample?
Sample: 25-30 days after you start to make mold. The accurate time depends on your product.
4. What is your main order time?
Order time: 35-40 days after the payment. The accurate time depends on your product.
5. What is your payment method?
Tooling: 100% TT advanced.
Main order: 50% deposit, balance 50% to be paid before shipment.
6. Which kind of file format you can read?
PDF, ISGS, DWG, STEP, MAX..